ADRIATIC LNG

Titanium piping fabrication and erection.

Client: Dragados Offshore
Propietary: Exxon-Mobil
Duration: 12 months
Date: 2009
PLANT G.N.L. ENAGAS HUELVA FASE-2

Fabrication and assembly of Carbon and Stainless Steel Piping System.
Flushing and Precomissioning.

Client: ENAGAS
Propietary: ENAGAS
Duration: 17 months
Date: 1991/92
BUZZARD

Fabrication and assembly Cunifer, Carbon and Stainless Steel, 6Mo, Duplex Piping.

Client: Dragados Offshore
Propietary: ENCANA
Duration: 12 months
Date: 2005
HAMMERFEST

Assembly of Titanium, Duplex, Stainless Steel, Cunifer Piping.

Client: Dragados Offshore
Propietary: STATOIL
Duration: 11 months
Date: 2004/05
KRISTIN

Fabrication and assembly of Titanium, Stainless Steel, Austenitic, Duplex Piping.

Client: Dragados Offshore
Propietary: STATOIL
Duration: 12 months
Date: 2003/04
IPC-78 B

Fabrication and assembly of process piping. Seafastening of the structure.

Client: Dragados Offshore
Propietary: PEMEX (PETRÓLEO DE MÉXICO)
Duration: 19 months
Date: 2002/2003
OBRA S.S. A.A. INTERQUISA

Production and assembly of Piping in the amplification of Interquisa.

Client: CEPSA
Propietary: CEPSA
Duration: 8 months
Date: 1995/96
CAPTAIN

Fabrication and assembly of process module.

Client: Dragados Offshore
Propietary: TEXACO
Duration: 11 months
Date: 1995/96
G.N.L. PLANT ENAGAS HUELVA FASE-3

Fabrication and assembly of Stainless Steel Piping.

Client: ENAGAS
Propietary: ENAGAS
Duration: 6 months
Date: 2004
INDEPENDENCE

Fabrication and assembly of Flare Tower.

Client: Navantia
Propietary: CONOCO
Duration: 6 months
Date: 1997